Bilfinger Contracted for Assembly & Installation of BP’s Green Hydrogen Plant in Lingen, Germany 

The BP refinery in Lingen with illustration of the new hydrogen plant in green. 

Industrial services provider Bilfinger has been awarded a contract as part of a consortium to deliver the prefabrication, assembly and installation of plant components for BP’s new green hydrogen electrolyzer. With a planned capacity of 100 megawatts, the new production facility is expected to become the largest of its kind for green hydrogen from bp and the first to be fully owned and operated by the energy company.  

Once the implementation is complete, the plant is expected to generate up to 11,000 tons of green hydrogen annually. Commissioning is planned for 2027. The plant will be powered by electricity from renewable energy sources. The green hydrogen produced could then be made available to industrial customers via a connection to the hydrogen core network and also be used in the neighboring refinery to produce lower-emission fuels. 

Bilfinger is tasked with the prefabrication, assembly, and installation of piping and plant components, thermal and cold insulation, and the installation of HVAC systems, among others. A team of over 200 Bilfinger professionals will be at work on site during peak periods. 

Bilfinger Group CEO Thomas Schulz comments: “We are glad that bp has entrusted us with supporting them in the implementation of their hydrogen initiative. Together with our valued customer, we are in a position to contribute further to the development of Germany’s hydrogen infrastructure. This collaboration represents a milestone in our strategy of becoming the number 1 for our customers in enhancing efficiency and sustainability.” 

In addition to the bp contract, Bilfinger is currently , further supporting the development of the city of Lingen into a leading hydrogen location in Germany. See www.bilfinger.com